How to Integrate EverFlow with Daton

This subtopic provides step-by-step instructions to create EverFlow integrations in Daton, detailing the prerequisites, the integration process, and important notes.

Need help with something?

Talk to data expert

Prerequisites

Before we get started, make sure you have:

  • An active Daton and Everflow Marketing account.
  1. Everflow API Key.
    For more information see related to API key, please check this official doc Authentication | Everflow
    How to Generate API Key & Scope Permission, Follow Below Document
    Authentication | Everflow
     

Integrate EverFlow with Daton

  1. Log in to your Daton account and search for EverFlow in the list of Connectors, then click Configure.
  2. Enter the following details and click Authenticate:
    1. Integration Name
    2. Replication Frequency 
    3. Replication Start Date
      Note that the Integration Name will be used to create the integration tables and cannot be modified later.
      Replication Date Setup Guidelines:
    4. N.B: To resolve the duplicate data issue coming from the API, we implemented an upperBound date mechanism. This means the system always starts pulling data from the next day of the replication start date.
      
      For example, if you want to begin pulling data from January 1, 2025, you should set the replication start date to December 31, 2024. This will ensure data is fetched starting from January 1, 2025.
      
      If you instead set the start date as January 1, 2025, the data pull will begin from January 2, 2025, which would cause the January 1 data to be missed.
  3. Provide the EverFlow API Key credentials and click authenticate:
     

4.After successful authentication, you will be prompted to choose from the list of available tables. Select the required tables and click Next
 

5.Select the required fields for each table and click Submit.
 

6.Note that you will be prompted to select the destination for your integration.

7.Select the destination for your integration and click Confirm. An integration successful message will be displayed.

Important Note

  • Integrations would begin in the Scheduled state and change to the Active state once the first job successfully loaded data into the configured warehouse.
  • Users can check job status and process logs from the integration details page by clicking on the integration name in the active list.
  • Users can Edit, Clone, Pause, or Delete the integration at any moment by clicking on settings. You can also adjust the frequency and history of the integration.
  • On the Sources page, click Integration to access each table in your integration. The page also shows the state of each table and the Reload access buttons.